Costing and Steps of Installation of a Generator Set (30 KVA - 40 KVA)

This is an example to put up a generator set in an office to support the office electricity requirements during the load shedding and power failures. It is assumed that the office has a minimum of 40 employees working a corporate setting. The costing is done on the basis of market survey and physical requirements.

  • Click here to download Steps to put up a Generator Set
  • Click here to download Generator Set (30 KVA - 40 KVA) Costing